Features and application

The bank construction is made in the form of powder-coated sheet steel casing whose size depends on power. The casing has ventilation grilles with filters, which ensures natural air circulation inside the bank and prevents dirt from getting inside the bank. Individual steps of the capacitor bank are connected to busbars selected according to power through fuse disconnectors with fuse links and contactors which connect capacitors to the network.Capacitors banks BK-APC

The main method of improving power factor cosφ is reactive power compensation which can be achieved by installing capacitor bank. Capacitor bank is a source of inductive reactive power and improves the power factor from the place of its installation to the energy source. In other words, instead of drawing reactive power from distant power plants, it is provided from capacitor banks installed on site. The mains is overloaded with the transmission of reactive power. BK APC capacitor bank is selected so as not to fully cover the demand to reactive power whose minor part is still covered by the mains. The capacitor bank is equipped with an electronic power factor controller which ensures a constant, preset cosφ value.

DCRL electronic reactive power controller, manufactured by LOVATO Electric, and 4G10 cam switch, switching on the controller’s power supply are mounted on the door of the capacitor bank.

Specification

Parameter

Value

Rated switching voltage [ Un ]

400 V

Rated insulation voltage [ Ui ]

690 V 

Measuring voltage of the controller

100 - 400 V 

Measuring voltage of the controller

50 Hz

Rated power

up to 25 do 500 kvar

Measured current range

0,01 - 5,3 A

Measuring transformer accuracy class

max 2 

Cos φ setting range

0,8 ind - 0,8 poj

Heat losses

0,5 W / 1 kvar

Number of steps activated by the controller

 3 to 12

Ambient temperature   

-25°C ÷ +45°C

Protection degree

IP 40

Cooling 

natural or forced

Options

Capacitor banks BK APC are available in three versions:

 

  • standard
  • with compensation step activation control
  • with contactor damage control (if main contacts are bonded)

 

 

No.

Power [ kvar ]

Number of steps

Casing size

Casing type

Width

Height

Depth

1

25 / 5

3

 

 

 

 

 

 

 

900

 

 

 

 

 

 

 

800

 

 

 

 

 

 

 

400

 

 

 

 

 

 

 

hanging

2

35 / 5

3

3

45 / 5

4

4

55 / 5

4

5

60 / 10

4

6

70 / 10

4

7

80 / 10

5

8

90 / 10

5

9

100 / 12,5

5

10

112,5 / 12,5

5

11

60 / 10

4

 

 

 

 

 

600

 

 

 

 

 

2000

 

 

 

 

 

600

 

 

 

 

 

 

 

 

 

 

 

standing

 

12

90 / 15

4

13

100 / 12,5

5

14

125 / 12,5

6

15

150 / 15

6

16

200 / 20

6

17

250 / 25

6

18

300 / 25

7

800

2000

600

19

350 / 25

7

20

400 / 25

9

1000

2000

600

21

450 / 25

10

22

500 / 25

11

1200

2000

600

Certificates and authorisations

Compliant with the following standards:

  • Regulations on Construction of Power Engineering Equipment (sheet)
  • Regulations on Operation of Power Engineering Equipment – SEP
  • PN-EN 61921:2004(U); PN-EN 60439-1:2003; PN-EN 60529:2003; IEC 61921:2003 standards
  • Technical Conditions for Execution and Acceptance of Construction and Assembly Works. Electrical Installations.